Architects, Builders, Fabricators, Engineers and Place Makers
 
 
change text to mindsoil (41 of 57).jpg
 

1903 Olympic BLVD.

Santa Monica, CA. Our second project in partnership with Redcar took place in 2008. The previous tenant sold watercraft, so the whole slab was sloped. Two concerns presented for this structure were flooding and a car coming into the building. We brought the sidewalk flush after the slab was leveled. Then an upturned beam was installed.

Size: 12,066 SF

 
 
 
racdb_51877181493.jpg
 
 

Services

1 Adaptive Reuse Strategies
2 Architectural Design 

change text to mindsoil (12 of 57).jpg
 
 
 
change text to mindsoil (25 of 57).jpg
 
 
change text to mindsoil (27 of 57).jpg
change text to mindsoil (51 of 57).jpg
 

The in-filled stucco paneling was removed to create the windows.

 
 
 
racdb_44862505739.jpg
 
 
 
change text to mindsoil (34 of 57).jpg
racdb_42148032591.jpg
racdb_42147932996.jpg
change text to mindsoil (52 of 57).jpg
 
racdb_42421302665.jpg
racdb_42148084144.jpg
change text to mindsoil (47 of 57).jpg